Vale, Frood Strobie 230kV/69kV Substation Feasibility Study
Location : Sudbury, Ontario
Year : 2016
Client : Vale
Project type : Feasibility study and cost estimations
The installation includes:
- one (1) 230/69kV transformer 230FS2T2
- one (1) 230kV breaker 230FS2B1
- one (1) 72kV main breaker 69FS2B2
- one (1) 72kV tie breaker 69FS2BXX
- one (1) 72kV disconnect switches 69FS2D6
- 69 kV tower structure and associated foundations
- two (2) 72kV feeds and associated breakers (69FS2B21, 69FS2B23) and switches (69FS2D21-B, 69FS2D23-B)
- power and control cabling, grounding, control building repairs, and protection and control equipment upgrade