Vale, Creighton Mine No.9 Substation Replacement Feasibility Study
Location : Sudbury, Ontario
Year : 2016
Client : Vale
Project type : Feasibility study and cost estimations
Scope :
- 69kV incoming power line connection
- Replacement of the two existing Creighton #9 substation 10MVA transformers with one 25MVA transformer c/w associated distribution equipment
- Replacement of the two 1500kVA 13.8kV/575V transformers and associated 600V switchgear
- Determine location of water, gas and fire hydrant.