Vale, Creighton Mine No.9 Substation Replacement Feasibility Study

Location : Sudbury, Ontario

Year : 2016

Client : Vale

Project type : Feasibility study and cost estimations

Scope : 

  1. 69kV incoming power line connection
  2. Replacement of the two existing Creighton #9 substation 10MVA transformers with one 25MVA transformer c/w associated distribution equipment
  3. Replacement of the two 1500kVA 13.8kV/575V transformers and associated 600V switchgear
  4. Determine location of water, gas and fire hydrant.